Planning assistance for area development for flaum protection for Lærdalsøyri
A newer notice was published for the same procedure. (update-add) TED 792180-2026, 13 Nov 2026. Dates and conditions of the latest notice prevail.
- Buyer
- Lærdal kommune, Lærdal
- Country
- Norway
- Published
- 19 Oct 2026
- Deadline
- 16 Nov 2026 (earliest lot deadline; time and time zone in the official notice)
- Procedure
- open
- Contract nature
- services
- Estimated value
- NOK 3,000,000 (sum of published lots)
- Place of performance (NUTS)
- NO0A2, NOR
- CPV
- 71410000 (Architecture and engineering services), 71240000 (Architecture and engineering services), 90711100 (Sewage, refuse and environmental services), 71400000 (Architecture and engineering services), 71311300 (Architecture and engineering services), 71317000 (Architecture and engineering services), 90712000 (Sewage, refuse and environmental services), 71250000 (Architecture and engineering services), 71000000 (Architecture and engineering services), 90711000 (Sewage, refuse and environmental services)
Procedure history
- TED 719562-2026 (this notice) · 19 Oct 2026 · cn-standard · Deadline 16 Nov 2026
- TED 792180-2026 · 13 Nov 2026 · cn-standard · update-add · Deadline 1 Dec 2026
Notices linked by their TED procedure identifier.
Description (original language)
Background Lærdalsøyri is the municipal centre in Lærdal municipality and it is subject to flaum from Lærdalselvi. Lærdal municipality shall, in cooperation with the Norwegian Water Resources and Energy Directorate (NVE), prepare an area development plan for total flaum protection for Lærdalsøyri. Lærdal municipality is the contracting authority and responsible for preparing the development plan. Bromwich has, on behalf of NVE, prepared a moglegheits study for heil-friendly protection of Lærdalsøyri against flaum disposals in Lærdalselvi. The study shows that it is mogleg to sikra Lærdalsøyri against flaum, but that this require encompassing measures on both sides of the river over a larger geographical area. The measures must be ready for planning before they can be engineered and executed. The planning work in question does not include the protection, but also the area necessary for access, construction, rigging, operation, inspection and future maintenance. The planning work must take inspections of the existing buset, industrial works subject, agriculture, infrastructure, landscape, natural values, cultural environment and other interests within and in the local area of the pla…
Notices can be corrected or cancelled by the buyer. The official notice on TED always prevails.
Source: TED, Publications Office of the EURetrieved: